Atkins

A happy customer always comes back – PTS and Atkins together in delivering affordable oil and gas to the world market

For the past ten years, PTS and Atkins have been continuously working with one another over a series of projects. This relationship began in 2007 when Atkins contracted PTS for a gas rig rendering project in the North Sea for one of the largest oil and gas company in the Nordics – Maersk Oil. PTS played an important role in the development of 3D models and the rendering of said gas rig as the basis for carrying out analysis and visualization of various structural configurations of a new type of production gas rig. Piping layouts, isometrics and instrumentation diagrams were also prepared by PTS including drafting tasks. From there on, Atkins has always considered PTS as one of its partners in bringing structures which benefit the global market.

PTS continued to be part of Atkins team. This time, the role was to generate a common documentation
system for Maersk Oil operation in the British sector of the North Sea.

PTS was then involved in another gas rig project of Maersk Oil in the Harald West Field. This project was
the conversion of the production gas rig from high to low pressure operation for which Atkins tasked PTS
to prepare object databases, structural drawings, generation of material take-offs and design of
platform structures. Two resident engineers from PTS were seconded to Atkins Danmark’s field office in
Esbjerg for this purpose.

Atkins Gas Rig

Maersk Oil started two new platforms namely Ada 1 and Ada 2. Atkins and PTS worked together again on this project. PTS provided 3D animated videos for marketing purposes.

Furthermore, PTS was contracted again by Atkins for the Tyra East and West Flare Systems. The assignment included the deployment of one Senior 3D Designer to Aalborg, Denmark to carry out 3D modeling of structures. On the other hand, the 2D detailed drawings were done by the team in Manila.

PTS provided design support services for a project in the Tyra North Oil and Gas Field. Included here was the production of 3D model of structures and a piping system for certification purposes and conceptual engineering design.

With all these works successfully completed, PTS and Atkins developed a relationship that showcases both professionalism and excellence.

Image courtesy of www.upstreaminsider.com
Atkins Gas Rig